LiveThursday · 22 October 2026Vol. VIII · No. 295
Bangalore
24°C · Overcast
Thu, 22 Oct
Latest
Politics

Namma Metro Phase 3: Karnataka issues third land acquisition notification for Orange Line package

The Karnataka government has issued a preliminary notification for the additional acquisition of land required for Package 1 of Namma Metro Phase 3, also known as the Orange Line.

Namma Metro Phase 3: Karnataka issues third land acquisition notification for Orange Line package

Dated October 16, 2026, and published in the Karnataka State Gazette, the notification identifies properties measuring a total of 13,409.05 sq. m. across 11 entries

Updated - October 22, 2026 07:14 am IST - Bengaluru

Corridor 1 will run 32.15 km from J.P. Nagar 4th Phase to Kempapura and have 22 stations, while Corridor 2 will cover 12.50 km between Hosahalli and Kadabagere, with nine stations. | Photo Credit: File photo

The Karnataka government has issued a preliminary notification for the additional acquisition of land required for Package 1 of Namma Metro Phase 3, also known as the Orange Line, between J.P. Nagar 4th Phase and the Mysuru Road side of the corridor. This is the third land acquisition notification issued for the package.

Dated October 16, 2026, and published in the Karnataka State Gazette, the notification identifies properties measuring a total of 13,409.05 sq. m. across 11 entries. It provides details of the properties proposed for acquisition, including identification numbers, survey numbers, land extent and information on existing structures.

The properties are located in Kaggalipura, Jaraganahalli and other localities along the proposed metro alignment.

“This is the third land acquisition notification issued for Package 1 of Corridor 1 of Namma Metro Phase 3. The notification is part of the land acquisition process for the 44.65-km Phase 3 project, which will expand Bengaluru’s metro network with 31 stations across two corridors,” a Bangalore Metro Rail Corporation Limited (BMRCL) official said.

Meanwhile, more than two years after the project received approval, BMRCL recently invited expressions of interest from Indian and international consultancy firms to serve as the General Consultant for Phase 3. The consultant will provide technical and project management support for the development of both corridors.

Corridor 1 will run 32.15 km from J.P. Nagar 4th Phase to Kempapura and have 22 stations, while Corridor 2 will cover 12.50 km between Hosahalli and Kadabagere, with nine stations.

BMRCL has applied for a Japanese Official Development Assistance loan of ¥102.48 billion from the Japan International Cooperation Agency (JICA) to part-finance the two corridors.

“The proposed JICA loan will meet only a portion of the overall project cost, while BMRCL will arrange the balance funding. Consultancy appointments and procurement for components financed through the loan will be carried out in accordance with JICA guidelines,” the official said.

The General Consultant will review engineering designs, prepare and finalise tender documents, assess bids, and assist with contract negotiations. Once construction begins, the consultant will also monitor quality standards, workplace safety and environmental compliance, coordinate contractors’ work, and support testing and commissioning before the lines become operational.

Phase 3 is expected to improve connectivity across Bengaluru and ease congestion on busy stretches, particularly along the western Outer Ring Road, Magadi Road and other major arterial roads.

The project also envisages integration with existing and under-construction metro stations, BMTC bus terminals, Indian Railways stations and proposed suburban rail stations being developed by K-RIDE.

Multi-modal integration facilities are planned at JP Nagar 4th Phase, JP Nagar, Kamakya, Mysuru Road, Sumanahalli, Peenya, BEL Circle, Hebbal, Kempapura and Hosahalli. According to officials, these facilities are intended to enable seamless transfers between different modes of public transport and improve access to the expanded metro network.

Published - October 21, 2026 07:16 pm IST

Karnataka / Bengaluru Metro

Terms & conditions | Institutional Subscriber

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.

Related in Politics

CMRL-Exalogic case: In an update from oral pronouncement, Supreme Court specifies freeze period as 10 days in published order
Politics

CMRL-Exalogic case: In an update from oral pronouncement, Supreme Court specifies freeze period as 10 days in published order

Supreme Court extends 7-day stay in CMRL-Exalogic case to 10 days, directs High Court to adjudicate FIR-related proceedings.

The Hindu22 Oct
Schools closed in five Tamil Nadu districts after overnight rain
Politics

Schools closed in five Tamil Nadu districts after overnight rain

Tamil Nadu shuts schools in five districts after overnight rain, with heavy rainfall reported in Mamallapuram, Tenkasi, and surrounding areas.

The Hindu22 Oct
Parvinder Singh Jhota: Who was the anti-drug activist, why was he killed
Politics

Parvinder Singh Jhota: Who was the anti-drug activist, why was he killed

Anti-drug activist Parvinder Singh Jhota was killed in Mansa after campaigning against illicit drug sales; recent updates include a CBI probe and political controversy.

The Hindu22 Oct
Controversy erupts after ‘protest’ photographs by Priyanka Gandhi’s son allegedly get removed from Bikaner House exhibition
Politics

Controversy erupts after ‘protest’ photographs by Priyanka Gandhi’s son allegedly get removed from Bikaner House exhibition

Controversy as Bikaner House allegedly trims Raihan Vadra’s protest photos, with Tiranga images and censorship claims sparking debate.

The Hindu22 Oct
23rd Kaladarshini cultural festival from October 26 in Vijayawada
Politics

23rd Kaladarshini cultural festival from October 26 in Vijayawada

23rd Kaladarshini Cultural Festival 2026 in Vijayawada invites students and artistes to showcase dance, music, arts, and theatre, Oct 26–31.

The Hindu21 Oct
T.N. government fixes car purchase ceiling at ₹26 lakh for Ministers, other key Assembly functionaries; sets ₹15-lakh cap for other MLAs
Politics

T.N. government fixes car purchase ceiling at ₹26 lakh for Ministers, other key Assembly functionaries; sets ₹15-lakh cap for other MLAs

Tamil Nadu fixes car purchase ceilings: ₹26 lakh for key leaders, ₹15 lakh for MLAs, with annual 5% increases and government procurement.

The Hindu21 Oct

Latest Across Vijaya Chronicle