LiveWednesday · 28 October 2026Vol. VIII · No. 301
Bangalore
19°C · Overcast19°C
Wed, 28 Oct
Latest
Local

Pink Line elevated corridor likely to be inaugurated on November 15: CM

CMRS clearance boosts Pink Line 7.5-km corridor; inauguration slated mid-November, pending Union government date confirmation.

Pink Line elevated corridor likely to be inaugurated on November 15: CM

In a step closer to the inauguration of the line, the 7.5-km elevated corridor between Kalena Agrahara and Tavarekere, received clearance from the Commissioner of Metro Railway Safety

Published - October 28, 2026 10:27 pm IST - Bengaluru

The 7.5-km elevated corridor between Kalena Agrahara and Tavarekere, received clearance from the Commissioner of Metro Railway Safety on Wednesday.

Chief Minister D.K. Shivakumar hinted that the elevated corridor of Namma Metro Pink Line is likely be opened in mid-November, saying that Prime Minister Narendra Modi was likely to visit the city for the Metro inauguration on November 15.

However, Greater Bengaluru Development Minister Krishna Byre Gowda said the dates had not been definitively confirmed by the Central representatives, who had only indicated a possible visit in mid-November. He said he was seeking an appointment with the representatives next week to confirm the dates.

In a step closer to the inauguration of the line, the 7.5-km elevated corridor between Kalena Agrahara and Tavarekere, received clearance from the Commissioner of Metro Railway Safety (CMRS) on Wednesday.

V. Venkatasubramanian, Commissioner of Metro Railway Safety, Southern Circle, had completed a three-day statutory safety inspection of the corridor earlier this month.

The inspection covered the corridor’s six stations, which included Kalena Agrahara, Hulimavu, IIM-B, JP Nagar 4th Phase, Jayadeva Hospital and Tavarekere.

After obtaining the CMRS clearance, Mr. Gowda said that after considerable effort, the safety sanction has been obtained for the corridor.

“We are ready to launch public service as soon as the Government of India gives a date for inauguration. We have already written to them requesting the date. We are eagerly looking forward to inaugurating the elevated Pink Line and taking another step towards serving people better by expanding the Namma Metro network,” he wrote on X.

The State government had earlier hoped to open the line in August and it has been pushed multiple times since then. The safety audits and the availability of Union government representatives for the inauguration pushed back the deadline.

The 7.5-km stretch, which is ready for inauguration, is part of the 21.3-km Pink Line. Its opening will extend the operational Namma Metro network from the current 96.10 km to 103.60 km.

The remaining 13.8 km of the Pink Line is an underground corridor. This section will connect Dairy Circle to Tannery Road via M.G. Road and Shivajinagar. Once fully operational, the line will connect the southern part of the city with the central part, facilitating travel for many office-goers.

Published - October 28, 2026 10:27 pm IST

Terms & conditions | Institutional Subscriber

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.

Related in Local

GBA to launch new campaign focusing on infra fix from November 1
Local

GBA to launch new campaign focusing on infra fix from November 1

Even as the Freedom from Waste campaign is under way, the Greater Bengaluru Authority (GBA) will launch a new campaign, titled “Ward One”, from November 1, focusing on addressing infrastructure issues.

The Hindu — Bangalore28 Oct
Ward-wise voter rolls for Bengaluru civic polls soon
Local

Ward-wise voter rolls for Bengaluru civic polls soon

In a ray of hope for Bengaluru civic polls, the State government has directed Greater Bengaluru Authority (GBA) officials to extend the necessary assistance to the State Election Commission (SEC) in preparing ward-wise electoral rolls for conducting the elections.

The Hindu — Bangalore28 Oct
GBA plans stricter safety norms for PG accommodations
Local

GBA plans stricter safety norms for PG accommodations

The Greater Bengaluru Authority (GBA) is preparing a fresh standard operating procedure (SOP) for the operation of paying guest (PG) accommodations, with a greater focus on safety and hygiene.

The Hindu — Bangalore28 Oct
Anti-SIR coalition urges Karnataka government to reject final SIR voter list, calls for social audit and public hearings
Local

Anti-SIR coalition urges Karnataka government to reject final SIR voter list, calls for social audit and public hearings

SIR-Virodhi Karnataka, a Karnataka-based coalition, has urged the State government to reject the final voters’ list prepared through the Special Intensive Revision (SIR) process.

The Hindu — Bangalore28 Oct
A Hundred Hands brings river edit to Bengaluru this weekend
Local

A Hundred Hands brings river edit to Bengaluru this weekend

The highlight of this edition of The Festival of Handmade is its river-themed collection

The Hindu — Bangalore28 Oct
Report pegs India’s all-time Indic AI funding at $687 million; more than 80% capital raised by Sarvam
Local

Report pegs India’s all-time Indic AI funding at $687 million; more than 80% capital raised by Sarvam

A newly released report by market intelligence platform Tracxn shows that India’s Indic AI ecosystem, comprising companies building AI for Indian languages, raised $687 million in equity funding across 34 companies as of October 15, 2026.

The Hindu — Bangalore28 Oct

Latest Across Vijaya Chronicle